Date:5/8

Today was a much easier day to work without having to stop and start with rain.  We were able to finish the Decking on the base.  This will allow us to move all the framing that's been worked on so far to the top of Blackwater which will be our final location.  Once everything is moved to Blackwater we will start to work on the gable walls of the frame which will have the entrance and exit.  Tomorrow will be an early day starting at 6 am to load everything on to a trailer to be moved to Blackwater.  We will then proceed to level it out and start the work on the gable walls.  Which should bring us to around 11:30 when we need to head off to games.

Hours: 9-2:30